Gibson Road Improvements

CIP 20-01 & 20-08

PhaseComplete

Construction Completion: Summer 2023

Project Description

This project improved a two mile-long corridor on Gibson Road from County Road 98 to East Street. The improvements include:

  • Rehabilitating pavement 
  • Restriping narrower travel lanes to slow traffic
  • Adding buffered bike lanes
  • Constructing ADA-compliant curb ramps and sidewalk repairs
  • Installing drainage improvements
  • Completing traffic signal improvements to include bicycle and pedestrian actuation 

The project also installed a pedestrian-actuated lighted crossing at California Street and lane reconfigurations or “Road Diet” that will reduce travel lanes between Cottonwood Street and West Street from four lanes to a three lane corridor consisting of two narrow travel lanes and a two-way left turn lane. 

These improvements transformed this segment of Gibson Road into a complete street providing improved bicycle, pedestrian, and vehicle facilities to ensure the corridor meets the needs of all modes of travel.