Sec. 20-2-44. Poles and transmission line carriers--Method of removing and replacing.

When a pole, brace, stub, or timber is removed and not replaced, the entire length thereof shall be removed from the ground and the hole backfilled and compacted. Where such pole, brace, stub or timber was located in an area paved with concrete, asphalt or other permanent surfacing, the area occupied shall be trimmed and resurfaced in kind to the satisfaction of the director of public works. (Ord. No. 1201, § 2 (part).)