Sec. 20-2-15. New street cuts.

New streets which have been surfaced with asphaltic concrete within three years or streets surfaced with seal coating within one year prior to excavation shall have a street restoration fee double that shown in the permit fee schedule as shown in the current comprehensive fee schedule or permit may be denied as determined by the director of public works. (Ord. No. 1201, § 2 (part).)