Sec. 19-4-4. Permit application.

(a) Users required to obtain a wastewater discharge permit shall complete and file with the director an application in the form prescribed by the director, accompanied by any required fees.
(b) Permit applicants must submit the following information on their wastewater discharge permit application form. Incomplete or inaccurate applications will not be processed and will be returned to the user for revision.
(1) Name, address, and location of discharge (if different from the address), an emergency contact telephone number and the name of the person to contact in the event of an emergency;
(2) SIC number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended;
(3) Number and type of employees, and proposed or actual hours of operation (i.e., the hours when the premises are physically occupied);
(4) Wastewater constituents and characteristics including, but not limited to, those mentioned in Article II of this chapter, as determined by a reliable analytical laboratory. Sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to Section 304(g) of the Act and contained in 40 CFR Part 136, as amended;
(5) Time and duration of discharges;
(6) Average daily and three-minute peak wastewater flow rates, including daily, monthly, and seasonal variation, if any;
(7) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connection, and appurtenances by the size, location and elevation, and all points of discharge;
(8) Description of activities, facilities and plant processes on the premises including all raw materials and chemicals used or stored at the facility which are, or could, accidentally or intentionally be discharged to the WPCF;
(9) Where known, the nature and concentration of any pollutants in the discharge which are limited by any city, state or federal pretreatment standards or pretreatment requirements, and a statement regarding whether or not the pretreatment standards or pretreatment requirements are being met on a consistent basis and if not, whether additional O&M and/or additional pretreatment is required for the user to meet applicable pretreatment standards or pretreatment requirements;
(10) If additional pretreatment and/or O&M will be required to meet the pretreatment standards or pretreatment requirements, a description of such additional pretreatment and/or O&M and the shortest schedule by which the user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall be no later than the compliance date established for the applicable pretreatment standard or pretreatment requirement.
The following conditions shall apply to this schedule:
(A) The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards or pretreatment requirements (e.g., hiring of an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.).
(B) No increment referred to in paragraph (A) shall exceed nine months.
(C) Not later than fourteen days following each date in the schedule and the final date for compliance the user shall submit a progress report to the director including, as a minimum, whether or not it complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with the increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the director;
(11) Each product produced by type, amount, process or processes and rate of production;
(12) Type and amount of raw materials processed (average and maximum per day);
(13) Any other information as may be deemed by the director to be necessary to evaluate the permit application.
(c) The director shall evaluate the data furnished by the user and may require additional information. Within thirty days of receipt of a completed application and after evaluation and acceptance of the data finished, the director may issue the wastewater discharge permit subject to appropriate conditions or may deny the permit application. (Ord. No. 1271, § 1 (part).)