CHAPTER 19. WASTEWATER DISCHARGE AND TREATMENT.
Article II. Discharge Requirements.
Sec. 19-2-9. Pretreatment required.
Users who are CIUs, SIUs, or who are required by the director to obtain a
wastewater discharge permit shall provide wastewater pretreatment as necessary
to comply with this chapter and shall achieve compliance with all pretreatment
standards, pretreatment requirements, local limits, any requirements of either
the CTR, NTR or a water quality plan adopted by the SWRCB pursuant to Water Code
Section 13170 which are incorporated into the user's wastewater discharge
permit, and the prohibitions of this chapter within the time limitations
specified by EPA, the state, or the director, whichever is more stringent. Any
facilities necessary for compliance shall be provided, operated, and maintained
at the user's expense. Detailed plans describing such facilities and operating
procedures shall be submitted to the director for review, and shall be
acceptable to the director before such facilities are constructed. The review of
such plans and operating procedures shall in no way relieve the user from the
responsibility of modifying such facilities as necessary to comply with this
chapter. Subsequent changes in the pretreatment facilities or method of
operation shall be reported to and acceptable to the director prior to the
user's initiation of the changes. (Ord. No. 1271, § 1 (part).)
<< previous | next >>