Development Projects

The City of Woodland Community Development Department reviews and processes a variety of planning applications for development projects. They can include residential additions, changes to historic structures, use permits, commercial projects, and subdivisions, as well as zoning and plan amendments. Links to information and documents for individual major projects are provided below.

PLNG No

Project Name / Owner/#

Location/Description

APN/ PLNG No

Review Status

 Active Current:

PLNG-19-00052

JATC Training Facility 
Blair, Church & Flynn
559-326-1400

Lot Merger and site plan/design review for the future JATC Training Center at the corner of Santa Anita Dr. & Tanforan Ave., APN 027-450-048, 049

In review

PLNG-19-00048

Beach Hut Deli
2120 Freeway Dr.

Mike & Trish Reiff
530-219-9324 

Site Plan/Design Review for a new   square foot commercial building and deli on 3,300 acres of land in the Regional Commercial/ light industrial flex zoning district.  APN 027-851-010

In review

PLNG-19-00042

Woodland Gateway II
Woodland Development Company, 18517 American Dr, Woodland CA

Eric Gonsalves
(209) 480-0585

Annexation/ Development Agreement/Conditional Use Permit for 25 acres located south of the existing Gateway Center, south of Bronze Star Boulevard to allow 50,000sf of retail Located in the CMU General Plan land use district

APN 027-390-032,033 and 034.

In review

PLNG-19-00036

309 C Street

Zoning Administrator Permit for a Proposed    sf warehouse on a 6250 sf lot in Armfield in the CMU- East zoning district; APN 063-072-004

In review

PLNG-19-00010

Pioneer Village (Merritt Ranch 5/8)
Cunningham Engineering

530-758-2026 X122 (Steve)

Subdivision Map/ SP Amendment, 231 new lots of R-5 (25.34ac)/R-8(19.14ac) low Density Residential and R-20 multifamily (4.11ac) totaling 55.45 acres.

Located at north-west corner of Farmers Central Rd & Pioneer Ave,  APN 042-580-068

PC October 17

CC hearing required

PLNG-18-00070

Parkside 3
Lennar Corp, 1420 Rocky Ridge Dr, Suite 320

Pierre Martinez
(916) 746-8508

(GPA/SPA/TM/DR/DA) A proposed General Plan and Specific Plan Amendment, Tentative Map, Design and Site Plan Review, and Development Agreement to develop 7.3 acres of property as a multi-family R-15 development with 98 units.  The applicant proposed to up-zone 3.5 acres of R-8 land use to R-15 to allow a consistent density. APN 041-231-028 & 041-243-002

Initial Submittal 8.8.18. Resubmittal on 11/21/18

Neighborhood mailer sent 4/9/19

Applicant considering re-design.

 

1424 E Main Street Woodland Storage (CUP)

Patrick Laughlin
591 Colusa
Yuba City, CA 95991
530-713-3895

CUP - Main Street and Matmor.  Request to allow approximately 118,500 sf self-storage facility with a manager’s unit

1424 E Main Street

APN 066-030-019, 021, 033

In review

Possible PC November


PLNG-19-00039

508 California
Site Plan/Design Review
MPE Holdings Inc. 

Aras Des & Const.
916-488-0110

Proposed three unit multifamily development

In review

PLNG-18-00046

22 Main Street
Tire Store
HB retail LLC

Nadeem 
916-230-5973

Redesign on a previously approved project to expand an existing tire store and showroom

In review

Pending

Tesla 

Located in Gateway-Target Parking Area

High Speed Charging Stations

Approval Letter

PLNG-19-00044

127 N. College

Ken Carter
530-662-8269

Certificate of Compliance

Routed

 Long Range/Advance Planning

 

Regional Housing Needs Assessment for the 6th cycle Housing Element due 2021 

City has received our housing needs allocation of 3,087 housing units of which approximately 1, 068 shall be available to lower income households. The city must zone an adequate amount of land to accommodate the RHNA allocation. Preparation for the 2021 Housing Element update

Zoning to meet the RHNA allocation will be taken into account as part of the comprehensive zoning update.

 

Woodland Research and Technology Park  SP-1A Specific Plan

 

Pre-Annexation, GPA, SP, EIR , DA- A pre-application was filed on July 17, 2015 for possible pre-annexation and future specific plan for approximately 350 acres in the area located east of Highway 113, south of Farmers Central Roadway, west of Harry Lorenzo Avenue and n and s of CA 25A.  


In process. City Council update September 2, 2019

Draft expected by end of the year.


 

Comprehensive Zoning Code Update

Comprehensive update of the City Zoning Code


Kick off Sept 11

Stakeholder Interviews October 29 & 30

Joint PC/CC meeting December 17

CC approval to enter into a contract with Lisa Wise Consulting  

 

Downtown Specific Plan Update

Update for consistency with General Plan Update.  Reconsideration of design, use, and possible addition of form based code components.  Update the Use table. 

Next Steps – public input

TO BE INCORPORATED INTO THE COMPREHENSIVE ZONING CODE UPDATE.

 

Update CEQA Guidelines/VMT/

TDM

Review and prepare city guidelines based on new OPR guidelines.


TDM list being prepared

 

Tree Ordinance

Modifications to tree ordinance regulations pertaining to development projects and private property.

In process

 


 

Woodland Commerce Center

Pete Thompson 916-930-0960

 

EIR, DA - North West corner of East Main Street and CR 102.

A proposed annexation for 146 acres of land with a GP designation of Industrial and pre-zoned Industrial.

Final EIR (draft) completed. RBF

Final EIR (draft) completed. RBF Cost/Scope received to create update memo.  Awaiting review by applicant to move forward with CEQA and DA negotiations

 

Planning Commission

First and Third Thursdays


 

Historic Preservation Commission

Third Wednesday

 

 Minor Reviews/Signs

PLNG-19-00040

904/914 First Street

Aulman & Dahl
530-662-2736

Lot line adjustment

Review Complete/ Certificate of Compliance complete

PLNG-18-00036

Telecomm. Tower Modification – Lee Middle  School

Design Review (Minor) for replacement/modification of antennas

In review

PLNG-19-00049

The Habit Burger
1368 E Main St

Design Review (minor) for Drive Thru and exterior signage

Review complete – forwarded to building for review

PLNG-19-00041

McDonalds
1500 E Main St

Design Review (minor) exterior signage

Review complete – forwarded to building for review

PLNG-17-00052

Cobram Estate
455 Harter

Design Review (minor) 60 x 60 production factory addition

Review complete – forwarded to building for review

Preliminary Review - Application hasn't been received yet

1860 E. Main St
Home Depot

Tenant improvements to expand retail space – interior tenant improvement – no increase to building footprint

Review complete – forwarded to building for review

 

Various signs



 

Custom SF Homes



 

Minor Ti/Patios/Accessory Bldgs



 Approved, In Construction or Plan Check Review

PLNG-19-00043

Ron Caceres 

440 College (back half of property)

Proposed TPM for future development located in District D of the Downtown Specific Plan Area.  A request to split a 0.23 acre lot to create two lots approximately 0.12 acres in size.

Approved PC October 17, 2019

PLNG-19-00022

Cleveland Suites Tentative Parcel Map

Dave Snow
916-804-1357

Proposed 16-lot Residential Subdivision Map located east of Cleveland Street and one lot south of Main Street. This site is located in Area C, a “Transition District,” of the Downtown Specific Plan Area.

PC approval 8.15.19

PLNG-18-00042

1490 E Main Street Staybridge Hotel (ZAP)

Ram Sah
250 W. Main Street, suite 201
530-409-5167

 

ZAP- Proposal to build a 109 unit extended stay hotel on a parcel behind the California Produce Market at 1490 E Main Street

APN 066-030-54, 55

Project approved per ZAP hearing on August 12, 2019

In Plan Check

PLNG-18-00092

Merritt Ranch
Darkhourse Estates LLC / Cunningham Engineering

530-758-2026 X122 (Steve)

Subdivision Map/ SP Amendment – Spring Lake Merritt Ranch 178 new lots of R-5/R-8 low Density Residential on 23.6 acres.

Located at 1425 Harry Lorenzo Ave. (southeast corner of E. Gibson Rd and Harry Lorenzo Ave.)  APN 042-580-001

CC approval

Second reading  8.20.19


PLNG-18-00056

Zendejas Auto Body – Armfield
1213-1215 Armfield Ave

Duane Thompson
530-666-4680

CUP -Conditional Use Permit to re-establish auto body shop at 1215 Armfield Ave within an existing building formerly used for the same purpose.  A lot merger will be required, creating a horizontal mixed-use project/site APN 063-077-002, 003

PC approval 9.6.2018

Cert of Compliance issued for lot merger 12/17/18.

Project complete

PLNG-19-00006

Z Specialty 1221 Harter Avenue

Josh Zeldner owner, Dorothy Rosenberg Applicant (530) 219-9774

Design and Site Plan review for an approximately 20,000 sq ft  industrial, event center, office to package honey. APN 027-420-015;

ZAP approval

In construction


PLNG-19-00024

Lifepointe Church Expansion
El Dorado and West Streets

Jim Morrow
916-997-0857

Church expansion, new building.

CUP-mod application.

Approved 7/18/19

PLNG-14-00079

814 Fifth Street

Iwa Huang

Rebuild after fire damage in the NP District. 

Nearing completion


 

Hays & Douglas Lane Hotels 
Hilton Tru & Courtyard

Rohit Ranchhod
916-761-5602

ZAP – Zoning Administrator Permit for two hotels at the northeast corner of Hays & Douglas Lane.  Hilton Tru is a 98 room, 4-story hotel with an energized, youthful style.  Courtyard is an 83 room, 4-story mid-priced hotel designed for business travelers. APN

APPROVED

In Plan check; processed Lot Line Adjustment


PLNG-18-00058

Avid Hotel

Roshan Patel
745 Meadowood Ct Woodland, 95695
(530) 908-5845

ZAP - A proposal to construct a 70-80 room hotel on a parcel of land north of I5 at 1200 Churchill Downs, Woodland CA   APN 027-460-012;

ZAP approved February 28, 2019


PLNG-18-00071

Idle Wheel Mobile Home Expansion
907 Bourn Dr. 

Dan Fitzgerald
500 Giuseppe Court #2
Roseville, CA 95678

CUP modification to add additional 10 mobile home spaces

APN 027-520-064

PC approval

PLNG-18-00027

Tanforan Ventures – 

Tanforan Ventures LLC
(916) 247-0094

CUP - A proposed manufacturing, distribution and testing facility; APN 027-450-070

 CC approval 10/16/18


In Plan Check

PLNG-18-00103

Epic Bros Enterprises, Inc
(925) 785-4950

A  manufacturing facility ; APN 027-420-023

CC approval 3/ 5, 2019

Complete

PLNG-18-00039

ProTerp Manuf C (916) 718-0793

CUP  A manufacturing facility; APN 027-420-023

CC approval 10/16/18

New plan modifications proposed

PLNG-17-00064

 

Woodland Motors Tentative Parcel Map 5136
530 Quality Circle

Scott Vanderbeek
916-442-2843

Tentative Parcel Map to subdivide one approx.. 25 acre parcel into 4 parcels in anticipation of future development.

APN 027-851-024

PC approval July 18, 2019.

In for final map check.

 

HOME 2 - Downtown Mixed-Use Hotel Project 

Jivan B. Patel and Ramilaben J. Patel Living Trust

1021 Main Street
Woodland, CA 
530-908-7106 

Request for a Conditional Use Permit, and Site Plan and Design Review approval, to construct a five-story, 90 room hotel, including 6,810 square feet of commercial space on the first floor of the building for retail/restaurant uses in the Central Business District, Downtown Specific Plan Area, District A4.

CC approval March 16, 2018

Pending requested modifications

 

Downtown Suites
Third and Lincoln 

Dave Snow
916-804-1357

14 units

PC approval 3.1.2018

In construction, first phase nearing completion

PLNG-18-00040

Mosque – 1225 East Oak Street

Mohammad Sadiq
530-315-4907

Staff Level Design Review and Lot Line Adjustment

Building Permit issued.

Lot Line Adjustment approved.

PLNG-18-00054

KB HOMES Design Review- Oyang North 

KB Home Ray Panek

A proposal for 112 single family homes, 52 R-8 and 60 R-5 homes (The Somerset): APN 041-070-037

PC APPROVED July 19

In construction

 

Oyang South
Lennar 
Harry Lorenzo Ave and CR25A

Pierre Martinez
916-746-8508

Map and Plan Check. 250, R-3 and R-4 residential units. The Orchard

PC APPROVED 6.21.18

In Construction

 

Phase 1,2,&4 Taylor Morrison 

Dave Kalemba
916-605-0640


In construction. 

PLNG-17-00061

DR Horton 

Todd Smith

99 unit

In construction – nearing completion

 

Lennar – The Orchard DR
CR102 and CR25A

Pierre Martinez
916-746-8508

Design Review and Site Plan approval for The Orchard Subdivision (associated with Subdivision Map No. 5048).  103 Units

In construction

Models open

 

Woodside Homes – The Pines DR
CR102 and CR25A

Design Review and Site Plan approval for The Pines Subdivision.  81 Units


In construction

 

Lennar The Grove
Harry Lorenzo Ave and Farmers Central Road

Pierre Martinez
916-746-8508

Design Review and Site Plan approval for The Grove Subdivision.  144 Units

In construction

PLNG-14-00090

Prudler  Tentative Subdivision Map, 

Yolo Residential Investors, LLC, 2625 Fair Oaks Blvd, #3, Sacramento Ca 

A tentative subdivision map, general plan amendment, development agreement to allow the development of 183 detached single-family units in two phases and a 1.46 acre park, on an approximately 38 acre site. Located at the northeast corner of East and Sports Park Drive.  APN 041-070-042

CC approval.


 

1351 E. Gum Ave -Country Oaks – Tim Snow

728 Edgewood Court Woodland, CA 95695
916-628-7867

Plan Check

In construction

PLNG-18-00102

Matmor Park Phase 2
1401, 1411 and 1421 Cannery Road

Kevin Woodbury

Site Plan/Design Review. Build out remainder of Matmor Park Mixed Industrial development site. Proposed 56,000sf spec building with three truck bays. APN 063-040-037, 038

Project approved in January. 

Phase I completed and operating

PLNG-16-00019

“Pearsons” 702 Main Street – Ron Caceres/John Anagnastou

Historic building remodel at 702 Main Street to a mixed use with retail on the bottom and 7 residential units. Project on hold

Oh hold

 

Diggs Bldg 514-518 Main Street – “Tree House” Live Music Venue

Building Remodel to accommodate an 800 seat music venue (second floor) and retail/restaurant space on the ground floor.

Oh hold - Historic Preservation Commission (HPC) Approved Bldg Storefront Remodel; music venue may require CUP (PC approval)

On hold

PLNG-18-00101

Woodland Christian School 

Jim Morrow
916-997-0857 

Construction of prior approved Theater, Gym, Preschool and Learning Center buildings at Matmor Campus.

In construction

 

Gateway Shopping Center
Petravitch Development

Final Map Review

PM5126 & 5148

Plan Check

PLNG-18-00068

AT&T Mobility
810 N East Street

Modification to existing Cell Tower

Complete

 PLNG-18-00086

1550 Spring Lake Court

SAC Wireless
626-482-9379

ZAP, Cell Tower Modification (Sprint)

Complete

PLNG-19-00015

Downtown – 435 Third Street 

Neal Pert Parking Lot

Proposal to create a parking lot in District D of the Downtown SP requires ZAP

In construction

PLNG-19-00029

U-Haul
1600 Tide Court
Americo Real Estate

Chris Trudell

Design Review/site plan review for exterior mini-storage

In construction

PLNG-18-00094

Adult Day Care
45 W Court Street

UCP of Sacramento
916-283-8302

Minor ZAP, Site Plan / Land Use Review

Writing up Approval and conditions

 

Gateway 
Woodland Development LLC
825 K Street
Sacramento CA 95814

Eric Gonsalves

Site Plan/Design Review for Shops 2 and restaurant drive-up

Approved with Building for plan check

 

Sparkles Car Wash
18440 County Road 102
Woodland Ca

Pasion & Enriquez Architecture
(916) 993-8886

Site Plan/ Design Review for the installation of new canopy vacuums

In construction

 

ADU
325 Lincoln Ave

Chris Campbell
Red House Design
530-662-6298

ADU Review

In construction

PLNG-19-00021

TPM
1310 E Beamer St

Anthony Romero

TPM for three lots and private court off Wilson Way with frontage on E Beamer

Approved by PC

In construction